Adding storage to a solar plant is often the best use of a constrained grid connection. It is also where PV engineering and storage engineering meet, and where a design that treats them separately goes wrong.

The design questions

  • How much storage, and where? Sized against the export limit, the tariff or contract, and the curtailment that would otherwise be lost.
  • AC-coupled or DC-coupled? Each has consequences for efficiency, controls, metering and the warranty split between suppliers.
  • How is it controlled? The energy management system has to respect the connection limit, the state-of-charge window, the warranty cycle limits and the market signals at once.
  • How is it financed? Lenders need a combined energy and revenue model, not a PV yield report with a battery added in the appendix.

Retrofits

Adding storage to an operating PV plant raises its own issues: available capacity at the point of connection, the protection and earthing design, metering, and the PPA and grid agreement. We assess what is possible and design the retrofit.